A Work In Progress…..Moving On Up

     Now, we’ll go upstairs to see the second floor of J’s Cabin  –  A work in progress.

J’s Cabin Staircase August, 2007

View from upstairs.
     A bannister and railing has been added.  Updated pictures later.  Remember, this staircase will be pulled out and replaced with a spiral staircase.

J’s Cabin Upstairs Bedroom

Upstairs Bedroom
There is a second floor balcony just outside the door.  This is all having to be remodeled.

J’s Cabin Upstairs Bathroom and Walk-In Closet 8/2007

Upstairs Bathroom and Walk-In Closet.
The toilet is behind the door and there is an oversized tub that you can just see a portion of.

J’s Cabin Upstairs Bathtub August, 2007

Upstairs Oversized Bathtub.
Advertisements

There are no comments on this post.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: