J’s Cabin Progress Update

     Here are more photos of J’s Cabin Property.  They are diligently working evenings and week-ends to get things done so that he can get to the add on.  As we wrote earlier, he will be adding a great room, master bed and bath on the south side of the cabin.

(Click on photo for full size image)

J’s Cabin Storage Building 9/10/07
 The storage building has been moved to the far southeast corner of the property and will be painted later.
(Click on photo for full size image)

J’s Cabin 9/10/07 South Side of Property

All of the metal framing has been pulled out and the brush cleared.  The storm cellar will be moved to the back of the property.  The metal framing was there for a large deck that the original owner had plans to build before they decided to sell.  This is where the add on will be.  The entrance into the great room will be where the blue square box is.
(Click on photo for full size image)
J’s Cabin South Side 9/10/07
Another south side view 

     The next post we plan to go inside and see the progress there.  Keep watching for more updates.

Advertisements

There are no comments on this post.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: